    Weight & Balance: Configuring Garmin Pilot for the Sling TSi and Exploring Aft CG Limits

    This post walks through how I set up Weight & Balance for a Sling TSi in Garmin Pilot, and how I use that setup to explore realistic scenarios where aft CG can become a consideration, particularly in a parachute-equipped aircraft. A few important notes up front. First, Garmin Pilot requires…

    Continue reading →: Weight & Balance: Configuring Garmin Pilot for the Sling TSi and Exploring Aft CG Limits
  • MX

    Beyond Logbooks: How Slingology MX Now Tracks the True Cost of Flying

    Published by

    Stathis Papaefstathiou

    on

    January 11, 2026
    Loading…
    Beyond Logbooks: How Slingology MX Now Tracks the True Cost of Flying

    Slingology MX started with a very specific problem: keeping aircraft maintenance, compliance, and records coherent. Not just stored somewhere, but structured in a way that reflects how owners actually think about their airplanes—maintenance tasks, directives, counters, equipment, notifications, and the slow, relentless march of time and hours. That foundation hasn’t…

    Continue reading →: Beyond Logbooks: How Slingology MX Now Tracks the True Cost of Flying
  • Ready Room

    Skew-T Diagrams for Winter IFR Flying: A Practical Preflight Guide

    Published by

    Stathis Papaefstathiou

    on

    January 6, 2026
    Loading…
    Skew-T Diagrams for Winter IFR Flying: A Practical Preflight Guide

    Winter IFR in the Pacific Northwest has a special talent for looking mostly fine right up until it isn’t. This is a part of the country where IMC is not an exception—it’s the baseline. Low ceilings linger for days. Moist air stacks up against terrain. Freezing levels hover just high…

    Continue reading →: Skew-T Diagrams for Winter IFR Flying: A Practical Preflight Guide
  • Ready Room

    How to Determine Service Bulletin Applicability for Your Aircraft Using AI

    Published by

    Stathis Papaefstathiou

    on

    January 1, 2026
    Loading…
    How to Determine Service Bulletin Applicability for Your Aircraft Using AI

    As a new aircraft owner, one of the first sobering realizations is that Service Bulletins are not optional reading—they are part of the ownership contract you didn’t explicitly sign. Before the airplane is considered complete and ready to fly, every applicable SB for installed equipment needs to be accounted for.…

    Continue reading →: How to Determine Service Bulletin Applicability for Your Aircraft Using AI
  • MX

    A Lightweight Maintenance & Compliance Dashboard for Experimental Builders

    Published by

    Stathis Papaefstathiou

    on

    December 25, 2025
    Loading…
    A Lightweight Maintenance & Compliance Dashboard for Experimental Builders

    Owning and building an experimental aircraft quietly turns you into several people at once. You’re the builder, the operator, the maintenance manager, the compliance officer, and—whether you intended it or not—the historian of the airplane. Regulations don’t care that these roles live in one human brain. They still expect clarity,…

    Continue reading →: A Lightweight Maintenance & Compliance Dashboard for Experimental Builders
  • Ready Room

    Could a Sling TSi Ever Have Autoland? A Thought Experiment

    Published by

    Stathis Papaefstathiou

    on

    December 22, 2025
    Loading…
    Could a Sling TSi Ever Have Autoland? A Thought Experiment

    TL;DR: Emergency Autoland has moved from impressive demos to real-world use, forcing a new question for general aviation: not whether an airplane can land itself perfectly, but how much automation is needed to avoid the worst possible outcome. This post breaks Emergency Autoland down into its fundamental requirements — deciding…

    Continue reading →: Could a Sling TSi Ever Have Autoland? A Thought Experiment
  • Build

    Builder Log: Ready for Paint — A Look Inside the Factory-Assist Build Process

    Published by

    Stathis Papaefstathiou

    on

    December 18, 2025
    Loading…
    Builder Log: Ready for Paint — A Look Inside the Factory-Assist Build Process

    This week’s visit to Torrance looked a little different from the recent ones. I wasn’t on the shop floor turning wrenches or checking off build tasks. Instead, this was a review milestone—looking at the work completed by the Airplane Factory team over the past several weeks and confirming that the…

    Continue reading →: Builder Log: Ready for Paint — A Look Inside the Factory-Assist Build Process
  • Hangar, MX

    The Hybrid Logbook: A Practical Record-Keeping Model for GA Pilots and Owners

    Published by

    Stathis Papaefstathiou

    on

    December 2, 2025
    Loading…
    The Hybrid Logbook: A Practical Record-Keeping Model for GA Pilots and Owners

    TL;DR: Aviation records must survive for decades, but digital tools rarely do. The most resilient approach for a GA pilot with a single airplane is a hybrid model: keep paper as the master, scan everything important as a backup, and use a lightweight online dashboard for reminders, planning, and analysis.…

    Continue reading →: The Hybrid Logbook: A Practical Record-Keeping Model for GA Pilots and Owners
  • Ready Room

    Garmin Pilot IFR Checklist for Real-World Flying: Quick Reference to the Rules You Need Most

    Published by

    Stathis Papaefstathiou

    on

    November 25, 2025
    Loading…
    Garmin Pilot IFR Checklist for Real-World Flying: Quick Reference to the Rules You Need Most

    TL;DR: A controller’s reminder about “procedure turn confusion” led me to build a Garmin Pilot IFR Checklist — a compact, quick-reference list of acronyms and rules we all tend to forget once the checkride is behind us. It’s designed for in-flight reference inside Garmin Pilot, covering items like IM SAFE,…

    Continue reading →: Garmin Pilot IFR Checklist for Real-World Flying: Quick Reference to the Rules You Need Most
  • Hangar

    From Builder to Owner: Understanding Aircraft Maintenance Logs

    Published by

    Stathis Papaefstathiou

    on

    November 22, 2025
    Loading…
    From Builder to Owner: Understanding Aircraft Maintenance Logs

    TL;DR: Your airplane’s logbooks are more than paper—they’re proof. They certify your airworthiness, protect your wallet, and tell the story of your machine. Whether you fly a certified Cessna or a homebuilt Sling TSi, the same truth applies: if it’s not written, it didn’t happen. This post breaks down what…

    Continue reading →: From Builder to Owner: Understanding Aircraft Maintenance Logs
Next Page

Eating an elephant one bite at a time.

Categories

  • Adventures (2)
  • Build (7)
  • Build Specs (18)
  • Community (8)
  • Hangar (6)
  • MX (3)
  • Ready Room (13)
  • Training (11)

Airmaster Airplane-Factory Avionics Configuration Construction Cross-Country Design EAA EFB Electrical Empennage Event FAA Firewall-Forward Fuel Fuselage Garmin IFR Industry Maintenance Medical Metal MOGAS MOSAIC My-Aviation-Story Ownership Paint Pilot-Gear Propeller Rotax Safety Travel Upholstery Wheels Wing


Get the latest posts

Slingology – Building and Flying a Sling TSi

  • Instagram
  • Threads
  • Bluesky
  • Mail
  • The Plane
  • The Pilot
  • The Decision
  • The Blog

  • Subscribe Subscribed
    • Slingology - Building and Flying a Sling TSi
    • Already have a WordPress.com account? Log in now.
    • Slingology - Building and Flying a Sling TSi
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
%d